September – October 2021

Magnitogorsk. Lifting, moving with the rigging method and setting in the projected position of two scrubbers of the air cleaning system of a blast furnace steel-making furnace weighing 60 tons and standing at a height of 30 m....

read more
June – July 2021

June 2021 Admiralty Shipyards Saint Petersburg - dismantling of the turning-boring machine model 1580 L with rigging equipment in the cramped conditions of the old workshop....

read more
June – August 2020

Amursk 2020 - together with "Spetsstroymash" LLC Unloading and installation of an autoclave of 1000 tons with a hydraulic lifting system SBL 1100...

read more
December 2019

JSC “Titran” performed rigging, overturning (tilting by 180 °) and installing the base of a vacuum chamber weighing over 100 tons in the design position at one of the enterprises of Roskosmos in Krasnoyarsk krai. The base diameter of the chamber exceeded 14 meters....

read more
November 2019

Nizhnekamsk The unique work of rigging a generator weighing in at 250 tons and a turbine weighing in at 110 tons was carried out by our specialists in Nizhnekamsk...

read more
2018 – 2019

Zapolyarny In 2018-2019 JSC "Titran" performed works on the installation of a lean concentrate enrichment shop at the facility...

read more